Timber Bridge 14′ x 30′ Heavy Duty

Timber Bridge 14′ x 30′ Heavy Duty
This is a 2 part 14′ x 30′ long Heavy Duty Bridge that has been purchased by a Utility Company and is being deployed for 6 months for access to a transmission line and then deployed in a different area for access to a gas line. The bridge had to be able to handle a serious amount of weight. This is rated BCFS L100 or about 98,000 kg. Abutments will be using lock blocks. 2 rods go through (14′) to secure the bridge from separating during use. A disappearing lifting plate (x 4) come out of the deck and are fastened by a Clevis for lifting the bridge. There is no trip hazard.